Structural Steel
Scaffold Steel Plank
Scaffolding Accessories
Scaffolding System
Structural Steel
Scaffold Steel Plank
Scaffolding Accessories
Scaffolding System

Rule of calculation for single scaffold.

Released on Dec. 18, 2017

First, we need to purchase scaffold parts to build scaffolding. Scaffold steel plank is necessary,others are steel ladder,scaffolding coupler,adjustable steel props and base jack,etc.

1. The scaffold shall be calculated when the wall height exceeds 1.2m.

2. The chimney scaffolds are integrated with vertical transport frame, ramp, cable, ground anchor, etc.

3. Water tower scaffolding shall be calculated manually by a factor of 1.11 on the corresponding chimney scaffold project.

4. The steel reinforced concrete chimney, water tower, silo, granulating tower, etc.

5. Steel structure engineering color steel plate wall panel mounting scaffold is multiplied by a factor of 0.25.

6. Scaffolds shall not be installed according to the concrete prefabricated parts calculated by the comprehensive scaffold, and the scaffolding shall be calculated and installed according to the construction organization's design.

base jack



amy
ivan
sharon