Set up plate buckle scaffolding is standard, directly determine whether the construction is safe, so before the erection, it is necessary to understand what matters need to pay attention to, so help to improve the construction of normative and security, here we come to a deeper understanding of the lower plate buckle scaffold building specification:
1, scaffolding quality testing.Before entering the construction site of the scaffold must go through quality testing, and testing standards qualified, with quality inspection report.
2, Choose the site, and the site of the geological quality testing, to ensure that the ground level, load-bearing capacity standards, will not form a collapse.Such as geological standards, ground leveling problems can be placed adjustable base.With adjustable base adjustment.
3, plate buckle scaffold building norms for construction workers also have certain provisions, plate buckle scaffold scaffold erection and removal must be trained professional shelf work as a licensed job; non-specific workers shall not be engaged in erection operations.Shelving workers into the construction site must be properly wearing a helmet, fasten the seat belt, each shelf workers to be equipped with non-slip gloves, non-slip shoes and tools safety hooks or bags, work tools to hang on the safety hook or into the bag.
4, erection of the frame body according to the requirements of erection of the first floor pole, horizontal bar, vertical sliders, laying platform steel springboard, step distance set reasonable, according to the requirements of pre-built by erection.According to the use of high demand, after the acceptance of the use of safety.