The cuplock scaffold is composed of a steel pipe pole, a cross bar, a cuplock scaffold joint and the like. the cuplock scaffold joint is composed of an upper cuplock scaffold, a lower cuplock scaffold, a cross bar joint and a limiting pin of the upper bowl buckle.
In the construction of scaffolding before the bowl button, to do construction preparation, the ground to keep flat, in order to ensure that the cuplock scaffolding after the erection can be safe, solid, regular, flat ground must be tamping.Place the sweep pole, upright pole, before starting to erect pole, the first to be ready to place the crossbar in place, and then take a long, and then erect pole.
Then the cuplock scaffolding should be how to build it?First, on the pole welding under the bowl and the bowl buckle buckle stopper pin, the buckle set into the bowl within the pole.When the cross bar and the oblique Rod are welded on the plug, when the cross bar and the oblique Rod are erected, the cross bar and the oblique Rod are inserted into the lower buckles, the buckles are pressed and rotated, and the buckles are fixed on the buckles by the limiting pin.Scaffold scaffolding column horizontal distance of 1.2 m, the vertical distance according to the scaffolding load may be 1.2 m, 1.5 m, 1.8 m, 2.4 m, STEP distance of 1.8 m, 2.4 m.When the erection of pole joints should be staggered.
These are small as we bring the cuplock scaffolding how to build the relevant knowledge, I hope to help you understand the bowl buckle scaffolding process.